← All sectors

Maintenance for automotive suppliers

Tier suppliers under customer audit, where every closed job has to leave a timestamped record with the technician's name on it.

Evidence produced as a by-product

The record is not a report somebody writes afterwards. It is what closing the job produces: who, when, what, and which parts.

Preventive that can be shown

A preventive plan generates its jobs on schedule and keeps the ones already done. What was planned and what was completed are both on file.

Downtime you can quote

The time between the report and the close is recorded on every job, so availability comes from the work itself rather than from an estimate.

Bilingual on the floor

French and English from the first screen, so an auditor and a technician read the same record, each in their own language.

Before the auditor arrives

The three questions that are hard to answer from a paper file.

  1. 01

    Was the preventive plan followed?

    The plan and the jobs it generated are held together, with a completion date on each.

  2. 02

    How long was this machine down?

    Report time and close time are on every job, so the gap is a number rather than a recollection.

  3. 03

    Who signed this off?

    The technician who closed the job is named on it, with the date and the time.

Have the record ready before it is asked for