← All sectors

Maintenance for logistics and cold chain

Refrigeration and handling equipment, where an outage does not only stop the work. It spoils what you are holding.

Critical machines go to the top

A cold room carries a higher criticality than a dock light. Its faults move up the queue on their own instead of waiting their turn.

Preventive on running hours

Compressors and forklifts wear by use, not by date. Plans trigger on counters, so a service falls due when the hours say it does.

A fleet that moves

Handling equipment is tracked per unit with its own history, so a forklift that keeps failing is visible as one machine and not as a category.

Reported the moment it is noticed

A driver or a picker scans the code and reports it in three taps, without leaving the aisle or going to find a supervisor.

The hour that costs the most

What happens between a cold room failing and somebody being on it.

  1. 01

    The fault is reported at the unit

    A scan and a short form. Whoever found it does not have to find anyone else first.

  2. 02

    Criticality moves it up

    The request is ranked against everything else open, and a critical asset does not queue behind routine work.

  3. 03

    The history is already there

    Whoever takes it sees what this unit has done before, what was fitted last time, and when it was last serviced.

Protect what is in the cold room